Projectors
The criteria for projectors are based on the most important environmental aspects, of which energy use in the use phase is one. Critera for projectors also include noise level which is a work related aspect.
Filter
Download | Description | |||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Energy performance | Core | Technical specification | ||||||||||||||||||||||
Criterion information A majority of the total environmental load of a projector consists of energy use in the use phase. Therefore it is important to set requirements that the projector should have a low energy use in on mode. Criterion text Projectors must fulfil energy requirements in on mode based on image size Amax, see also "Energy efficiency, projectors" (only in Swedish). Amax/office
Amax/video
| ||||||||||||||||||||||||
Noise level | Core | Technical specification | ||||||||||||||||||||||
Criterion information Sound from the projector does not result in environmental effects but can be experienced as disturbing by the user, especially if the working environment otherwise is quiet. The largest source of sound from projectors is the fan. By setting requirements on noise levels, sound can be reduced and a better working environment be achieved. Criterion text The declared A-weighted soundpower level LWAd must not exceed the limits in the tables below. The sound power level for eco mode must be at least 0,2 B(A) lower than the declared sound power level during normal operating mode. Declarerad A-weighted sound power level LWAd shall be measured according to ISO 9296:1988 and declared according to ISO 7779:1999, unit bel (B) or decibel (dB), or equivalent standards. Image size Amax/office
* Equivalent light output setting where products fulfil picture quality requirements according to Amax (often lower than max light output). | ||||||||||||||||||||||||
Mercury-free light sources | Core | Technical specification | ||||||||||||||||||||||
Criterion information Mercury is a toxic heavy metal that occurs among other things in light sources. By limiting the use of mercury, effects on both humans and environment can be reduced. Criterion text Projectors must contain light sources that do not contain mercury (Hg). | ||||||||||||||||||||||||
Halogenated flame retardants in plastic and rubber parts | Core | Technical specification | ||||||||||||||||||||||
Criterion information Halogenated flame retardants are toxic and are not biodegradable. Criterion text All plastic and rubber parts in the specified product(s) weighing at least 25 grams may not contain halogenated flame retardants at more than 0.1% by weight. Parts that are considered to be plastic or rubber are those that are mainly composed of plastic and/or rubber; that is, containing at least 50% by weight. | ||||||||||||||||||||||||
Halogen free materials in power cables | Advanced | Award criteria | ||||||||||||||||||||||
Criterion information Halogen-free materials reduce the risks of releasing environmental and health hazardous substances during faulty waste management. Criterion text In order to receive [points/discounts] during tender evaluation, power cables must be halogen free in accordance with the definition given in the IEC 62821 standard; that is, that they may contain no more than:
The product(s) that is(are) covered by this award criterion is shown in the relevant position, product list or equivalent. In its tender, the supplier states whether the award criterion has been met (for the product(s) to which it applies). During tender evaluation, the contracting organisation may request that suppliers verify that the criterion is met. If the supplier is not able to verify that the criterion is met, the contracting organisation will not award the tender with the specified points or price reduction for the relevant position. | ||||||||||||||||||||||||
Design for facilitating disassembly | Core | Technical specification | ||||||||||||||||||||||
Criterion information The purpose of this criterion is to facilitate recycling of the imaging equipment. Criterion text The projector must be constructed in such a manner that disassembling is possible. This entails that:
| ||||||||||||||||||||||||
Information on the inclusion of substances of very high concern | Core | Special contract terms | ||||||||||||||||||||||
Criterion information Through this condition, the contracting authority receives information regarding content of substances of very high concern in the products. Criterion text At the start of the [framework agreement/contract], the supplier shall declare the presence of any substances included in the REACH Regulation Candidate List (Article 59 of Regulation (EC) No 1907/2006 concerning the Registration, Evaluation, Authorization and Restriction of Chemicals) in concentrations over 0.1 percent by weight (1,000 mg/kg) for each substance in the supplied equipment. 0,1 percent by weight applies to each individual component of a product.1 If new substances are added to the list during the period of the [framework agreement/contract] and can be found in the procured products, the supplier is responsible to inform the procuring organization in writing regarding the change. The supplier shall upon request also present an action plan for how the substance can be phased out.
| ||||||||||||||||||||||||
Routines for the substitution of hazardous substances in products | Advanced | Special contract terms | ||||||||||||||||||||||
Criterion information By setting this requirement, you ensure that suppliers work actively to replace substances that are hazardous to the health and environment that are used in their products. Criterion text As part of its operations as manufacturer (trademark owner), the supplier shall have implemented procedures, models, assessment systems or similar, to substitute substances hazardous to the health or environment present in the equipment. The supplier shall also have their own documented procedures for how this should be handled toward the purchaser. The procedures or similar, shall be documented and put into action throughout the term of the contract. They must at least include the five steps in the European Chemicals Agency's (ECHA's) model for substitution to safer chemicals1:
Within [three weeks/other time determined by the contracting organisation] of receiving a request from the contracting organisation, the supplier must present procedures etc. for how these steps are implemented with regards to the contracted products. | ||||||||||||||||||||||||
Requirements under the ILO core conventions | Core | Special contract terms | ||||||||||||||||||||||
Criterion information The contract terms on the basic level aim to ensure that the supplier has effective risk management regarding workers' rights under the ILO core conventions in its own operation as well as in the supply chain regarding subcontractors who are directly involved in the performance of the contract. Criterion text 1. The supplier's obligation Throughout the entire contract period, the supplier shall apply the contract terms under item 1-4. The contract shall be fulfilled in accordance with the following terms regarding workers’ rights:
The terms regarding workers’ rights are called “the Terms” hereafter. In the event of the core conventions of the ILO are in conflict with national law, the supplier shall take reasonable measures to ensure compliancy with the international regulations. The obligations concerns workers when they perform work within the frame of the contract. The supplier shall, according to item 2, ensure that the Terms are fulfilled by hired subcontractors that directly contribute to the performance of the contract, regardless of the number of intermediaries. In addition, the supplier shall ensure that these subcontractors participate in the follow-up, The obligations concerns work carried out under such conditions where Swedish labour law is not applicable. 2. Policies and routines To fulfil the obligations under item 1, the supplier shall take measures to prevent and manage any deviations from the Terms according to item 2.1-2.6 below. The measures shall be documented and applied throughout the entire contract period in their own operation and the operation of any subcontractors who directly contribute to the performance of the contract, regardless of the number of intermediaries. At the start of the contract the supplier shall have: 2.1 adopted a commonly accessible policy, adopted by the highest management including a commitment to respect the Terms, 2.2. adopted routines to convey their commitment to respect the Terms in their own operation and in the supply chain, 2.3 appointed a manager at the highest management level, responsible for compliance with the Terms, 2.4 adopted routines to regularly carry out risk analyses, i.e. to identify and prioritise current and potential risks of deviation from the Terms, as well as mapping the supply chain with special regard to high risk operations, 2.5 adopted routines for regular follow-up of the Terms compliance, and 2.6 adopted routines to immediate action to prevent and limit deviations from the Terms, and to make amendments to identified deviations. The measures shall be taken in accordance with the UN Guiding Principles on Business and Human Rights, or the equivalent. 3. Follow-up [The contracting authority] has the right to follow-up that the supplier fulfils its obligations. The follow-up may be carried out in different steps; self-assessment and audit. 3.1 Self-assessment 3.2 Audit 4. Management of deficiencies If the supplier does not participate in follow-up or if there are deficiencies in the documentation to be provided under item 3, a correction shall be made within the time determined by [the contracting authority]. In case of deficiencies in compliance to the Terms, the supplier shall amend this according to a schedule and action plan, developed by the supplier, and to be approved by [the contracting authority]. The schedule and action plan are to be developed within the time period decided by [the contracting authority] and must be proportionate to the nature of the deficiencies and clearly describe how these are to be remedied within the established schedule. [The contracting authority] has the right to terminate the contract with immediate effect if the supplier do not make amendments within the established period or do not remedy deficiencies within the established [The contracting authority] has the right to terminate the contract with immediate effect in the case of severe deviations from the Terms. | ||||||||||||||||||||||||
Sustainable supply chains | Advanced | Special contract terms | ||||||||||||||||||||||
Criterion information The terms regarding sustainable supply chains aim to ensure that the supplier has efficient risk management in their own operation and in the supply chain, covering the areas human rights, labour rights, environmental protection and anti-corruption. Criterion text 1. The supplier’s obligation Throughout the entire contract period, the supplier shall apply the contract terms under item 1-4. The contract shall be fulfilled in accordance with the following terms regarding human rights, workers’ rights, environmental protection, and anti-corruption (sustainable supply chains):
The terms regarding sustainable supply chains are called “the Terms” hereafter. When international regulations prescribe a stronger protection for the individual than the national legislation, the supplier shall take reasonable measures to ensure compliancy with the international regulations. The obligations concerns all operations connected to the performance of the contract. The supplier shall, according to item 2, ensure that the Terms are fulfilled by hired subcontractors in all parts of the supply chain. In addition, the supplier shall ensure that these subcontractors participate in the follow-up, according to item 3. 2. Policies and routines To fulfil the obligations under item 1, the supplier shall take measures to prevent and manage any deviations from the Terms according to item 2.1-2.6 below. The measures shall be documented and applied concurrently throughout the entire contract period in their own operation as well as in the operation of any subcontractors in all parts of the supply chain. At the start of the contract the supplier shall have: 2.1 adopted a commonly accessible policy, adopted by the highest management including a commitment to respect the Terms, 2.2. adopted routines to convey their commitment to respect the Terms in their own operation and in the supply chain, 2.3 appointed a manager at the highest management level, responsible for compliance with the Terms, 2.4 adopted routines to regularly carry out risk analyses, i.e. to identify and prioritise current and potential risks of deviation from the Terms, as well as mapping the supply chain with special regard to high risk operations, 2.5 adopted routines for regular follow-up of the Terms compliance, and 2.6 adopted routines to immediate action to prevent and limit deviations from the Terms, and to make amendments to identified deviations. The measures shall be taken in accordance with the UN Guiding Principles on Business and Human Rights, or the equivalent. 3. Follow-up [The contracting authority] has the right to follow-up that the supplier fulfils its obligations. The follow-up may be carried out in different steps; self-assessment and audit. 3.1 Self-assessment 3.2 Audit 4. Management of deficiencies If the supplier does not participate in follow-up or if there are deficiencies in the documentation to be provided under item 3, a correction shall be made within the time determined by [the contracting authority]. In case of deficiencies in compliance to the Terms, the supplier shall amend this according to a schedule and action plan, developed by the supplier, and to be approved by [the contracting authority]. The schedule and action plan are to be developed within the time period decided by [the contracting authority] and must be proportionate to the nature of the deficiencies and clearly describe how these are to be remedied within the established schedule. [The contracting authority] has the right to terminate the contract with immediate effect if the supplier do not make amendments within the established period or do not remedy deficiencies within the established [The contracting authority] has the right to terminate the contract with immediate effect in the case of severe deviations from the Terms. |
The criteria for projectors are based on the most important environmental aspects, of which energy use in the use phase is one. Critera for projectors also include noise level which is a work related aspect.
When choosing a projector it is also relevant to consider the amount of heat produced from the projector during usage to consider if there is a need of cooling of the room.
Criteria do not include projectors for cinema use.